A tower crane operator described the view through four year old polycarbonate crane cab glazing as looking through a dirty pair of glasses. The glazing was intact. It had crazed across the whole panel from years of dust wiped with a dry rag.
Polycarbonate crane cab glazing is specified for impact and then judged on optics. Those two requirements pull in different directions, and the resolution is surface protection plus a cleaning rule that operators will actually follow.
Impact, optics and the polycarbonate crane cab glazing
- Front and load line panels: 10 mm, hard coated
- Side and roof panels: 8 mm
- Forming radius: 600 mm minimum for optical sheet
- Distortion check: grid viewed from the seat eye point
Hard coating on the outer face is what keeps the panel readable through years of dust. The coating costs a fraction of a replacement and moves the failure from optics to the frame seal.
Forming, fitting and the polycarbonate crane cab glazing
Optical sheet formed at a controlled temperature holds a grid pattern without the wave that a fast form produces. A formed panel checked against a grid from the operator eye point is the practical acceptance test.
Replacement on site
Panels supplied pre drilled to a cab template go in with the existing bolts in under an hour. Site cut panels are where seal failures begin, because a hand cut edge cannot hold a gasket line.
River People forms and pre drills crane cab glazing to cab templates. Send the cab drawing and fleet size to oversales@rpplexiglass.com.
Send the cab drawing, eye point height and fleet count to oversales@rpplexiglass.com for a quotation on cut and formed glazing.
Cab glazing and machine windows share an abrasion problem, and the hard coated polycarbonate glazing notes explain the coating choice.
Frequently Asked Questions
Why polycarbonate in a crane cab?
Impact resistance at the load line and no shattering into the cab if a sling strikes the glass. Laminated glass is optically better but heavier and fails differently.
Does curvature distort the view?
Above a 600 mm radius the distortion at the eye point is negligible. Tighter curves need optical grade sheet and a controlled forming cycle.
Can glazing be replaced on site?
Yes if the unit is supplied pre drilled with a template. Cutting and drilling in a cab at height is where most replacement damage happens.
